CMU AXLE03

415 unique locations - 3.5MW total capacity

PO22 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
PO16 (22 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PO10 (17 components)
• Domestic demand turn down (2)
• Domestic EV charger
DSR AXLE ENERGY LIMITED Unproven DSR CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
PL9 (22 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PL32 (5 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PH4 (2 components)

Domestic EV charger

DSR AXLE ENERGY LIMITED Proven DSR CMU
Active • 2024-25 (T-1), 2024-25 (T-4)
PE28 (84 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2027-28 (T-4), 2025-26 (T-1) ...
PE27 (12 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
PE21 (20 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR LEVELISE LIMITED Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PE19 (60 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
DSR ATTUNE POWER LTD Unproven DSR CMU
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 10 locations