Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AVON19

1 unique locations - 32.6MW total capacity

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
β€’ Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth. (2)
β€’ Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED New Build Generating CMU
Inactive β€’ 2023-24 (T-4), 2022-23 (T-1) ...
Loading map...
Showing 1 locations