9 unique locations - 1.5MW total capacity

100 Montifichet Road, Westfield, Stratford E20 1GR (62 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...
47.16 MW
Bodelwyddan, Royal Welch Ave, Bodelwyddan, Rhyl LL18 5TQ, United Kingdom (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
• 1.200MW of battery storage located at Hook.
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2020-21 (T-4) ...
0.11 MW
Kingsilver Refinery, Church Lane, Hixon ST18 0PY, United Kingdom (5 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the south of Edinburgh Rd, Maryport, Cumbria, CA15 8ES. (2 components)

Electro-Chemical Battery Energy Storage System (BESS)

Inactive • 2020-21 (T-4)
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (6 components)
• 1.2MW Battery Storage located at National Express Coventry
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 9 locations