CMU ADGS17

3 unique locations - 3.8MW total capacity

2.13 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (14 components)
β€’ Gas reciprocating engines
β€’ The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
22.55 MW
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 3TD (7 components)
β€’ 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
β€’ Gas reciprocating engines
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
20.11 MW
Loading map...