CMU ADABS2

10 unique locations - 4.5MW total capacity

Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (3 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (2 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (3 components)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

1.200MW of battery storage located at Hook.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
• 1.200MW of battery storage located at Hook.
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2020-21 (T-4) ...
0.11 MW
Land North of Clayhill, Westoning, MK45 5JD. (4 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2020-21 (T-1)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (3 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (6 components)
• 1.200MW of battery storage located at Durham.
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.26 MW
New Winning Pumping Station CastleEden Hartlepool Cleveland, TS27 4TF (2 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)