Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU A4AVAR

4 unique locations - 2.0MW total capacity

2.13 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (14 components)
β€’ Gas reciprocating engines
β€’ The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
22.55 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (6 components)

Gas reciprocating engines (3)

Active β€’ 2024-25 (T-1), 2023-24 (T-1) ...
1.85 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (17 components)
β€’ 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
β€’ Gas fired generating units
β€’ Gas reciprocating engines
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
25.88 MW
Loading map...
Showing 4 locations