Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU A3AVAR

4 unique locations - 2.0MW total capacity

Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (16 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
14.23 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (19 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.16 MW
Loading map...
Showing 4 locations