CMU 6RES35

2 unique locations - 3.2MW total capacity

North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (19 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.83 MW