Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU 5RES-4

8 unique locations - 0.8MW total capacity

195 Aylesone Rd, Leicester LE2 7QJ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (19 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (18 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (12 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (8 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 8 locations