Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU 3CEES1

6 unique locations - 4.2MW total capacity

195 Aylesone Rd, Leicester LE2 7QJ (17 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
18.20 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (13 components)
β€’ Office site with behind the meter back up generation
β€’ Office site with behind the meter generation
β€’ Office site with behind the meter generation.
DSR GB GAS HOLDINGS LIMITED Unproven DSR CMU
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
21.99 MW
2600 John Smith Drive, Oxford, OX4 2JY (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR GB GAS HOLDINGS LIMITED Unproven DSR CMU
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
24.10 MW
2 Leeds City Office Park, Leeds, LS11 5BD (4 components)
β€’ Office site with behind the meter back-up generation
β€’ Office site with behind the meter back-up generation.
DSR GB GAS HOLDINGS LIMITED Unproven DSR CMU
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
7.11 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
24.10 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (12 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
12.71 MW
Loading map...
Showing 6 locations