Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CMU ID: WATERS

197 locations 726 components 14 companies 15 technologies Page 4 of 4
WATER PUMP STATION, HIGH ROAD, ASHTON KEYNES, SWINDON, SN6 6NX (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
Waters Edge Close, Whitehaven, Cumbria, CA28 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Waterswallows Energy Limited DSR
Active - 2025-26 (T-1)
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (1 components)

On site reduction in consumption

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (1 components)

On site reduction in consumption

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
WESSEX WATER RADIPOLE PS, RADIPOLE LANE, WEYMOUTH, DORSET, DT4 9RN (1 components)

On site reduction in consumption

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (1 components)

On site reduction in consumption

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 components)

On site reduction in consumption

Waterswallows Energy Limited DSR
Active - 2024-25 (T-1)
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (3 components)

A gas engine CHP site providing hot water to agricultural greenhouses (2)

Waterswallows Energy Limited Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

LIMEJUMP LTD DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Water Mill Clough Oldham Lancashire OL2 (1 components)

EV charging at residential premises

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-1)
Water Lane Chelveston WELLINGBOROUGH NORTHAMPTONSHIRE NN9 (1 components)

EV charging at residential premises

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-1)
Wimbourne Bournemouth BH21 5EP (4 components)

Water treatment centre (3)

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Francis Avenue Bournemouth BH11 8NX (4 components)

Water treatment centre (3)

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Christchurch Bournemouth BH23 2JY (4 components)

Water treatment centre (3)

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Braunton Road Ashford Barnstaple Devon EX31 4BR (4 components)

Water treatment centre (3)

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Chenhalls Road St Erth Hale Cornwall TR27 6LA (4 components)

Water treatment centre (3)

Waterswallows Energy Limited DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Northumbrian Water Plc Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (3 components)

2 MW of demand reduction (2)

LIMEJUMP LTD DSR
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

FLEXITRICITY LIMITED DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Cranbrook CHP, Honiton Road, Cranbrook, Exeter, EX5 2DX (3 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP … (2)

E.ON UK PLC Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Waterswallows Energy Limited DSR
Inactive - 2022-23 (T-1), 2021-22 (T-4)
Red Roofs Nursery Limited, Dunswell Road, Cottingham, Hull, HU16 4JT (1 components)

A gas engine CHP site providing hot water to agricultural greenhouses

Waterswallows Energy Limited Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4)
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Waterswallows Energy Limited Reciprocating engines
Inactive - 2022-23 (T-4)
KGV Pumping Station, East Camperdown Road, Dundee, DD1 3LG (2 components)

Water pumping station comprising of electrical pumps that can be modulated or turned off.

Waterswallows Energy Limited DSR
Inactive - 2022-23 (T-4)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

FLEXITRICITY LIMITED DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Waterswallows Energy Limited Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (6 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)

Waterswallows Energy Limited Energy from Waste
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2020-21 (T-1) (and 1 more)
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Waterswallows Energy Limited DSR
Inactive - 2021-22 (T-4)
Morcott WTW, Wing Water Treatment Works, Morcott Road, Morcott Wing, OAKHAM Leicestershire, LE15 8SA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Waterswallows Energy Limited DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (3 components)

Hungry Snout Water Pumping Station (3)

Waterswallows Energy Limited DSR
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
  • • Battery Storage Facility
  • • Energy facility comprising of reciprocating engine sets
Waterswallows Energy Limited Storage OCGT and Reciprocating Engines
Inactive - 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Waterswallows Energy Limited DSR
Inactive - 2021-22 (T-4)
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Waterswallows Energy Limited DSR
Inactive - 2020-21 (T-1)
Showing locations 151 - 197 of 197