Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CMU ID: WATERS

28 locations 251 components 8 companies 6 technologies Page 1 of 1
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Statkraft Markets GmbH Hydro
90.7 MW
Inactive - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (14 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd … (5)

Waterswallows Energy Limited Hydro
78.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CITIGEN (LONDON) LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Waterswallows Energy Limited Storage (Duration 2h)
20.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
14.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (16 components)
  • • A site with two gas engine CHPs, providing hot water to a local district heating network (4)
  • • A site with two gas engine CHPs providing hot water to a local district heating network
E.ON UK PLC Combined Heat and Power (CHP)
4.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (5)

Waterswallows Energy Limited Combined Heat and Power (CHP)
3.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (9 components)

A gas engine CHP site providing hot water to an industrial unit (5)

Waterswallows Energy Limited Combined Heat and Power (CHP)
1.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 5 more)
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

E.ON UK PLC Combined Heat and Power (CHP)
1.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

E.ON UK PLC Combined Heat and Power (CHP)
1.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Colindale CHP, Joslin Avenue, Barnet, London, NW9 5HW (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel (8)

E.ON UK PLC Combined Heat and Power (CHP)
1.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

E.ON UK PLC Combined Heat and Power (CHP)
0.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX (8 components)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (5)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (3)
Waterswallows Energy Limited Combined Heat and Power (CHP)
0.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

E.ON UK PLC Combined Heat and Power (CHP)
0.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

E.ON UK PLC Combined Heat and Power (CHP)
0.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

E.ON UK PLC Combined Heat and Power (CHP)
0.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

E.ON UK PLC Combined Heat and Power (CHP)
0.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

E.ON UK PLC Combined Heat and Power (CHP)
0.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (9 components)

1.89MW Battery Storage located at United Utilities Preston (5)

BESS Holdco 8 Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (4 components)

CHP at a water treatment works in Glasgow. (3)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2022-23 (T-1)
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
The Mount, Virginia Water, Surrey, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
WATER LANE, PURFLEET, ESSEX, RM19 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (3 components)

HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity … (3)

Waterswallows Energy Limited VikingLink (Denmark)
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4)
Water Street , Chorley, PR7 1EX (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
FLEXITRICITY LIMITED DSR
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 components)

Permitted Onsite Generator located at Waste Water Treatment works

Waterswallows Energy Limited DSR
Active - 2025-26 (T-4)
Showing locations 1 - 28 of 28