Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CMU ID: WATERS

18 locations 119 components 6 companies 3 technologies Page 1 of 1
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (14 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd … (5)

Waterswallows Energy Limited Hydro
78.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

GRIDBEYOND LIMITED Combined Heat and Power (CHP)
14.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (16 components)
  • • A site with two gas engine CHPs, providing hot water to a local district heating network (4)
  • • A site with two gas engine CHPs providing hot water to a local district heating network
E.ON UK PLC Combined Heat and Power (CHP)
4.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (5)

Waterswallows Energy Limited Combined Heat and Power (CHP)
3.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX (8 components)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (5)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (3)
Waterswallows Energy Limited Combined Heat and Power (CHP)
0.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan SA13 2PG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
The Mount, Virginia Water, Surrey, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
WATER LANE, PURFLEET, ESSEX, RM19 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Waterswallows Energy Limited DSR
Inactive - 2022-23 (T-1), 2021-22 (T-4)
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (9 components)

1.89MW Battery Storage located at United Utilities Preston (5)

BESS Holdco 8 Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Water Street , Chorley, PR7 1EX (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
FLEXITRICITY LIMITED DSR
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (4 components)

EV charging on residential premises (4)

Waterswallows Energy Limited DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (4 components)

CHP at a water treatment works in Glasgow. (3)

FLEXITRICITY LIMITED Combined Heat and Power (CHP)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2022-23 (T-1)
Showing locations 1 - 18 of 18