Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CMU ID: SAND-1

27 locations 104 components 10 companies 7 technologies Page 1 of 1
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)

Existing OCGT (5)

E.ON UK Plc Reciprocating engines Open Cycle Gas Turbine (OCGT)
127.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Huntsman Drive, Seal Sands, TS2 1TT (3 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural … (2)

E.ON UK Plc Combined Cycle Gas Turbine (CCGT)
32.0 MW
Inactive - 2024-25 (T-1), 2023-24 (T-1)
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS (2 components)

Offshore wind farm

E.ON UK Plc Offshore Wind
11.6 MW
Active - 2028-29 (T-4)
Seal Sands, Middlesbrough, TS2 1UB (14 components)
  • • One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)
  • • One of four SURF (Aggreko) model CHP units rated at 1375KVA (2)
E.ON UK Plc CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 3 more)
Seal Sands, Middlesborough, TS2 1UB (14 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (5)

E.ON UK Plc CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 3 more)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (4 components)

Turbo Expander - for pressure reduction of incoming natural gas (3)

E.ON UK Plc CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 components)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

E.ON UK Plc Combined Cycle Gas Turbine (CCGT)
Inactive - 2021-22 (T-4)
Marston STW, MARSTON STW (LINCS), Track Off Sand Lane, Marston, GRANTHAM Lincolnshire, NG32 2HY, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

E.ON UK Plc DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Sand Street , Pwllheli, LL53 5RT (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
E.ON UK Plc DSR
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
Bellway Woburn Sands Milton Keynes MK17 (4 components)

EV charging at residential premises (4)

E.ON UK Plc DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Church Road Woburn Sands Milton Keynes Buckinghamshire MK17 (4 components)

EV charging at residential premises (4)

E.ON UK Plc DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WEATHERCOCK LANE WOBURN SANDS MILTON KEYNES BUCKINGHAMSHIRE MK17 (4 components)

EV charging at residential premises (4)

E.ON UK Plc DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WILKIE COURT WOBURN SANDS MILTON KEYNES MK17 (4 components)

EV charging at residential premises (4)

E.ON UK Plc DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
BACK ST. MICHAELS GROVE BOLTON LE SANDS CARNFORTH LA5 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
BALDOON SANDS MIDDLESBROUGH TS5 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
BANK SAND ROAD WEDMORE SOMERSET BS28 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
Bell Hill Park Grange-Over-Sands Cumbria LA11 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
CONISTON ROAD BOLTON LE SANDS CARNFORTH LANCASHIRE LA5 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
COTTAGE CHARNEY ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
KENTS BANK ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
NEW SUPPLY TO NEW A FAR MOSS ROAD BLUNDELL SANDS LIVERPOOL MERSEYSIDE L23 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11 (2 components)

EV charging at residential premises (2)

E.ON UK Plc DSR
Inactive - 2024-25 (T-1), 2023-24 (T-1)
BARN SUNNYSIDE FARM MEATHOP GRANGE-OVER-SANDS CUMBRIA LA11 (1 components)

EV charging at residential premises

E.ON UK Plc DSR
Inactive - 2023-24 (T-1)
The Crescent, Grange-Over-Sands, Cumbria, LA11 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

E.ON UK Plc DSR
Active - 2025-26 (T-1)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (6 components)
  • • One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083 (3)
  • • One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
E.ON UK Plc Combined Cycle Gas Turbine (CCGT)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

E.ON UK Plc DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Showing locations 1 - 27 of 27