CMU PPBB21

2 unique locations - 16.3MW total capacity

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU
Active β€’ 2025-26 (T-1)
13.07 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
43.43 MW
Loading map...
Showing 2 locations