CMU ID: GLEN_1

3 locations 5 components 1 companies 2 technologies Page 1 of 1
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE (2 components)
  • • 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
  • • 49.9 MW standalone battery energy storage project.
GLENDEVON ENERGY STORAGE LIMITED Storage (Duration 2h)
18.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Lubreoch Power Station, Bridge of Balgie, Glen Lyon, Perthshire, PH15 2PX (2 components)

Hydro Generation Unit - Lubreoch (2)

GLENDEVON ENERGY STORAGE LIMITED Hydro
7.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Showing locations 1 - 3 of 3