Search Map View Statistics Support Us Help Login Register

CMU ID: EL0065

1 location 5 components 1 companies 2 technologies Page 1 of 1
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h)
14.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Showing locations 1 - 1 of 1