CMU ID: COWLEY

6 locations 44 components 3 companies 5 technologies Page 1 of 1
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
  • • The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
27.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
COWLEY MEADOW WAY CRICK NORTHAMPTONSHIRE NN6 (8 components)

EV charging at residential premises (4)

COWLEY BALDON GREEN LIMITED DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
COWLEY GREEN WOMBWELL BARNSLEY S73 (4 components)

EV charging at residential premises (4)

COWLEY BALDON GREEN LIMITED DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Cowley Hill Borehamwood Hertfordshire WD6 (4 components)

EV charging at residential premises (4)

COWLEY BALDON GREEN LIMITED DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
COWLEY ROAD UXBRIDGE MIDDLESEX UB8 (4 components)

EV charging at residential premises (4)

COWLEY BALDON GREEN LIMITED DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 6 of 6