Capacity Market Search

Displaying items 1 - 10 of 29 matching components (Page 1 of 3)

Component Results (29)

Sort by: Relevance Location Date
Sorted by Relevance (Lowest First)

DEBUG: Template sees CMU ID: VWMbed | DB ID: 15559

Beddington Farmlands Waste Management Facility, Beddington Lane, Croydon, Surrey, CR0 4TG

Beddington ERF .- Energy Recovery Facility

VIRIDOR ENERGY LIMITED CMU: VWMbed Capacity N/A 2020-21 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CARvwm | DB ID: 16500

Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN

CARvwm is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point)

VIRIDOR ENERGY LIMITED CMU: CARvwm Coal/biomass Capacity N/A 2021-22 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CARerf | DB ID: 754

Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point).

VIRIDOR ENERGY LIMITED CMU: CARerf Capacity N/A 2020-21 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: VWMdun | DB ID: 15560

Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW

Dunbar ERF, Energy from Waste

VIRIDOR ENERGY LIMITED CMU: VWMdun Capacity N/A 2020-21 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CARerf | DB ID: 755

Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point).

VIRIDOR ENERGY LIMITED CMU: CARerf Capacity N/A 2017-18 (T-1) One Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: AVON19 | DB ID: 21838

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU

Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the …

VIRIDOR ENERGY LIMITED CMU: AVON19 Energy from Waste Capacity N/A 2023-24 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: AVON21 | DB ID: 18750

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU

Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the …

VIRIDOR ENERGY LIMITED CMU: AVON21 Energy from Waste Capacity N/A 2022-23 (T-1) One Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: AVON19 | DB ID: 21837

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU

Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the …

VIRIDOR ENERGY LIMITED CMU: AVON19 Energy from Waste Capacity N/A 2022-23 (T-3) Three Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: AVON20 | DB ID: 15701

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU

Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the …

VIRIDOR ENERGY LIMITED CMU: AVON20 Energy from Waste Capacity N/A 2021-22 (T-1) One Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CARD21 | DB ID: 43311

Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN

Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.

VIRIDOR ENERGY LIMITED CMU: CARD21 Energy from Waste 32.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction