Sutton Bridge Project:
The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
T-4Year: 2027Combined Cycle Gas T...DB ID: 43178Comp ID (from source _id?): 54633
Full auction: 2027-28 (T-4) Four Year Ahead Capacity Auction | CMU ID: 23SB01
Sutton Bridge Project:
The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
T-4Year: 2025Combined Cycle Gas T...DB ID: 43179Comp ID (from source _id?): 219977
Full auction: 2025-26 (T-4) Four Year Ahead Capacity Auction | CMU ID: 23SB01