Capacity Market Search

Displaying items 1 - 1 of 1 matching components

Component Results (1)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: PPNW22 | DB ID: 44353

South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNW22 Storage (Duration 2h) 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction