Capacity Market Search

Displaying items 1 - 10 of 38 matching components (Page 1 of 4)

Component Results (38)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: PPKM24 | DB ID: 46591

Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPKM24 Storage (Duration 1h) 4.01 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPLD24 | DB ID: 46592

Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPLD24 Storage (Duration 8.5h) 8.03 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPMN24 | DB ID: 46593

Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPMN24 Storage (Duration 8.5h) 6.82 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBB23 | DB ID: 45120

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB23 Storage (Duration 9h) 6.04 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBT23 | DB ID: 45121

Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBT23 Storage (Duration 9h) 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPKM23 | DB ID: 45122

Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPKM23 Storage (Duration 9h) 3.49 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPLD23 | DB ID: 45123

Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPLD23 Storage (Duration 9h) 6.50 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPNP23 | DB ID: 45125

Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNP23 Storage (Duration 9h) 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPSL23 | DB ID: 45127

Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPSL23 Storage (Duration 9h) 5.68 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBB22 | DB ID: 44346

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB22 Storage (Duration 2h) 8.03 MW 2026-27 (T-4) Four Year Ahead Capacity Auction