Displaying items 1 - 2 of 2 matching components
DEBUG: Template sees CMU ID: LETCHA | DB ID: 5194
New Build 20MW Gas fired facility, metered on the distribution network boundary using a COP2 meter with no auxilliary load on site
DEBUG: Template sees CMU ID: LETCHA | DB ID: 5195
New Build 20MW Gas fired facility, metered on the distribution network boundary using a COP2 meter with no auxilliary load on site