Search Map View Statistics Support Us Help Login Register

Search Results for "BESS Claredown Limited"

2 unique locations (6 components)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 components)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Inactive - 2022-23 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (5 components)
  • • 20MW Battery Storage Facility located in Sudbury, Essex. (2)
  • • 20 MW of DSR
  • • 20 MW of demand reduction
Inactive - 2021-22 (T-4), 2020-21 (T-4) (and 3 more)
Showing locations 1 - 2 of 2
Performance Metrics
Total Load Time

1.100s

Performance Breakdown
Company Search: 0.107s
Location Search: 0.210s
Pagination: 0.296s
Component Count: 0.250s

Optimized Direct LocationGroup Rendering

This search uses direct database objects without dictionary conversion, resulting in ~90% faster load times compared to the standard search.