All Locations
15949 unique locations (49545 components) - Page 1 of 638
100 Cathcart Rd, Glasgow G42 7BH (6 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)
Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 β¦ (3)
10-14 Birmingham Road, West Bromwich, B71 4LD (3 components)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
1020 CENTRE PARK, WARRINGTON WA1 1QY (2 components)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
1020 SLUTCHERS LANE, WARRINGTON, WA1Β 1QL (3 components)
gas generation (3)
106 Scrubs Lane, Willesden, NW10 6QY (1 component)
"EMR European Metal Recycling 106 Scrubs Lane, Willesden, NW10 6QY The CMU Component reduces import demand by turning off equipment and other non-essential loads."
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)
16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
111 Brancroft Way Enfield Middlesex EN3 7PL (13 components)
Enfield CCGT Power Station - (one unit station) (3)
112 Beddington Lane, Beddington CR0 4TB (4 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
112 Beddington Lane, Croydon, CR0 4TB (1 component)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)
2.52MW Battery Storage located at PepsiCo Leicester factory
120 London Wall, London EC2Y 5ET (1 component)
This is an office building with large chillings
125 Cheston Road Birmingham B7 5EA (1 component)
Energy centre comprising of lean burn, acoustically treated natural gas reciprocating engines.
1/2 Factory Lane, Network House, Croydon, Surrey, CR9 3RA (1 component)
Demand reduction from on-site generation
13 - 18 Queen Street, Oxford, OX1 1AB (1 component)
DSR Component providing load turn down at a retail store
13-18 Queen Street, Oxford, OX1Β 1AB (4 components)
DSR component providing load turn down at a retail store (2)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)
Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.
133 Balornock Road, Glasgow, G21 3UW (10 components)
Generators on hospital site (3)
1345 Govan Rd., Glasgow, G51 4TF (4 components)
CHPs at Queen Elizabeth Hospital (3)
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid