Capacity Market Search

Displaying items 41 - 50 of 57 matching components (Page 5 of 6)

Component Results (57)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: SP16TO | DB ID: 3188

Tongland, Kirkcudbrightshire. DG6 4LT. Scotland

Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

DRAX RIVER HYDRO LIMITED CMU: SP16TO Capacity N/A 2020-21 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP16TO | DB ID: 3189

Tongland, Kirkcudbrightshire. DG6 4LT. Scotland

Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

DRAX RIVER HYDRO LIMITED CMU: SP16TO Capacity N/A 2020-21 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP-GLE | DB ID: 11943

Location N/A

Glenlee hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity of SP-GLE = 30MVA or 24MW at 0.8PF. Each of the 2 components = 12MW. …

Drax River Hydro Limited CMU: SP-GLE Capacity N/A 2019-20 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP-KEN | DB ID: 11944

Location N/A

Kendoon hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity of SP-KEN = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW. …

Drax River Hydro Limited CMU: SP-KEN Capacity N/A 2019-20 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP-TON | DB ID: 11945

Location N/A

Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity of SP-TON = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW. …

Drax River Hydro Limited CMU: SP-TON Capacity N/A 2019-20 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP-TON | DB ID: 11946

Location N/A

Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity of SP-TON = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW. …

Drax River Hydro Limited CMU: SP-TON Capacity N/A 2019-20 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP14GL | DB ID: 7076

Location N/A

U2 Import 1800053653719 U2 Export 1800053653728. Import measurement will be the plant auxiliary load. The export will be the generated load minus the site auxiliary load. Registered capacity of SP-GLE …

Drax River Hydro Limited CMU: SP14GL Capacity N/A 2018-19 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP14KE | DB ID: 7077

Location N/A

U2 Import 1800053653737 U2 Export 1800053653746. Import measurement will be the plant auxiliary load. The export will be the generated load minus the site auxiliary load. Registered capacity of SP-KEN …

Drax River Hydro Limited CMU: SP14KE Capacity N/A 2018-19 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP14TO | DB ID: 7081

Location N/A

U3 Import 1800053653807 U3 Export 1800053653816. Import measurement will be the plant auxiliary load. The export will be the generated load minus the site auxiliary load. Registered capacity of SP-TON …

Drax River Hydro Limited CMU: SP14TO Capacity N/A 2018-19 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SP14TO | DB ID: 7082

Location N/A

U2 Import 1800053653782 U2 Export 1800053653791. Import measurement will be the plant auxiliary load. The export will be the generated load minus the site auxiliary load. Registered capacity of SP-TON …

Drax River Hydro Limited CMU: SP14TO Capacity N/A 2018-19 (T-4) Four Year Ahead Capacity Auction