Capacity Market Search

Displaying items 211 - 215 of 215 matching components (Page 22 of 22)

Component Results (215)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: SLH2G4 | DB ID: 22833

SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH

Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs …

SIMEC LOCHABER HYDROPOWER 2 LIMITED CMU: SLH2G4 Hydro Capacity N/A 2022-23 (T-3) Three Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SLH2G5 | DB ID: 22841

SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH

Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs …

SIMEC LOCHABER HYDROPOWER 2 LIMITED CMU: SLH2G5 Hydro Capacity N/A 2022-23 (T-3) Three Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: BGH001 | DB ID: 44616

Meeting Business Park, Park Road, Ormsgill, Barrow-in-Furness, Cumbria, England, LA14 4TL, United Kingdom LA14 4TL

Hydrogen Production plant consisting of six of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

BARROW GREEN HYDROGEN LIMITED CMU: BGH001 DSR Capacity N/A 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: LGH001 | DB ID: 45017

Lower Langage Farm, Kings Way Plympton Plymouth PL7 5AW

Hydrogen Production plant consisting of two of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

LANGAGE GREEN HYDROGEN LIMITED CMU: LGH001 DSR Capacity N/A 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: TGH001 | DB ID: 45204

132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY,

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

TRAFFORD GREEN HYDROGEN LIMITED CMU: TGH001 DSR Capacity N/A 2027-28 (T-4) Four Year Ahead Capacity Auction