Capacity Market Search

Displaying items 1 - 4 of 4 matching components

Component Results (4)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: TYEL24 | DB ID: 43124

Land to the North of Tye Lane, Ipswich, IP8 4NP

CMU is a photovoltaic system

DAMSONGREEN ENERGYFARM LIMITED CMU: TYEL24 Solar Photovoltaic 1.19 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBF22 | DB ID: 44347

Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

DAMSONGREEN ENERGYFARM LIMITED CMU: PPBF22 Storage (Duration 2h) 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: TYEL24 | DB ID: 43123

Land to the North of Tye Lane, Ipswich, IP8 4NP

CMU is a photovoltaic system

DAMSONGREEN ENERGYFARM LIMITED CMU: TYEL24 Solar Photovoltaic 1.04 MW 2025-26 (T-1) One Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBF23 | DB ID: 37468

Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

DAMSONGREEN ENERGYFARM LIMITED CMU: PPBF23 Storage (Duration 2h) Capacity N/A 2024-25 (T-1) One Year Ahead Capacity Auction